On 6 April 2003 Transfield staff destressed a section of the southbound line. Here the first cut is made. |
Another section opposite is removed. |
The rail is eased into position. |
A southbound unit eases slowly towards the cut section. |
The thermit weld mould is prepared. |
Final preparations are made before heating. |
Just about ready to add the mix. |
The pot starts to flame and the process of welding begins. |
The weld takes place. |
The mould is removed from the weld. |
The weld is cleaned up with a little brute force. |
The new weld is now cleaned up with grinding tools. |
A little bit more off the top edge... |
...and now to smooth the whole thing off. |
|
A northbound freight passes the work site. |
Crane EL6002 is seen at Wellington Loco depot on 7.2.2004. |
A Transfield road-rail track is seen near Linden on 15.5.2004. |
ETM214, a Tamper is seen at Porirua on 31.10.2004. |
ETM296, a Ballast Equalizer is seen at Porirua on 31.10.2004. |
Track Evaluation Car EM80, routinely visits passenger-carrying lines 4 times a year and is seen here on the Johnsonville line at Fraser Ave on 2.11.2004. |
EM80 emerges from Tunnel 2 en route for Palmerston North on 3.11.2004. |
During a break in their tamping duties, staff take a break at Porirua Station early on 11th December 2005. |
EM80, the track evaluation car passes Takapu Road on 12.5.2006. |
| | | |